The City of Corpus Christi Traffic Engineering office advises residents beginning on Friday, December 21, 2012 through January 7, 2012, weather permitting; city contractors will shifted the Wooldridge traffic onto the eastbound lanes between Rodd Field Road and Quebec Drive. Traffic on this section of Wooldridge will be reduced to one lane in each direction. In addition, Quebec Drive will be closed at the Wooldridge intersection and traffic detoured onto Bevo Drive.
Traffic control devices will guide motorists through the construction site. While the work is underway, motorists should expect delays and are advised to seek alternate routes to avoid the area if possible. Motorists are also advised to observe all construction warning signs and barricades for their safety and that of construction crews. Access to local driveways will be maintained throughout the duration of the project.
For more information, please contact Traffic Engineering at 826-3547.